Engineering Support for PIF design 2020

 

Project description:

 

Seaway7 is T&I contractor of the foundations for Formosa 2 OWF project. The scope consists of T&I of 47 four legged jacket type OWT foundations with associated pin piles in Taiwan.

 

 

ARC’s scope of work:

Seaway 7 requested ARC to support them with the engineering work for designing the Pile Installation Frame (PIF). The design includes Structural Integrity verification of the PIF in SACS for various conditions e.g: lifting, transport, operations, levelling, etc.