Inch Cape

Project description:

The Inch Cape Offshore Wind Farm is being developed by Red Rock Power Limited (RRPL), and is expected to generate between 570 to 700MW of power. Boskalis in consortium with NKT has been awarded the Offshore Export Cables scope of work. This includes the design, manufacture and installation of the Offshore Export Cables. This comprises of a PCA (Pre-Construction Agreement) and ECC (Export Cable Contract) phase. Boskalis will work with Employer and Employer’s other main subcontractors as part of the PCA phase in an open discussion as part of Early Engineering works with the delivery of a few key deliverables.

ARC’s scope of work:

  • Assist with generating deliverables for the Early Engineering works and interface with employer’s subcontractors to provide cable installation feedback on the design process.