Installation Engineering & Operational Support

DEME Offshore – St. Nazaire (2022) Project & Field Engineering Support

DEME has contracted ARC to provide project and field engineering support on the T&I secondary works. The following specific activities are to be overviewed and planned as part of the SOW at every installation location

Learn More

DEME Offshore – Kaskasi OWF (2022) Inter Array Cable Installation Analysis

DEME Offshore contracted ARC to provide the following: - Freelay analysis - A&R analysis - Survival analysis - 1st end pull-in analysis - 2nd end pull-in analysis - Reporting

Learn More

Boskalis – Kakinada (2021) Project Engineering Support

The scope of work envisaged for ARC-SES was as follows: - Development and writing the project’s Installation Manual - Mobilisation and Offshore Support

Learn More

Petrogas E&P – HELM decommissioning (2021) Decommissioning Support

The ARC Engineers supported the various decommissioning projects, where required (e.g. Helm, Haven, Hoorn) by preparing documentation, reviewing engineering and vendor documentation, defining scopes of work, etc.

Learn More

Petrogas Helm (2021) Project Engineering/Decommissioning Support

The ARC Engineers supported the Petrogas Helm decommissioning project, by preparing documentation (procedures & lift plans), reviewing engineering and high level drawings in Solid Works.

Learn More

Boskalis Subsea Cables – Sandbank & Hornsrev 3 (HR3) Offshore Wind Farms – Engineering support (office & offshore) CPS stabilization via rock bag installation

Boskalis was awarded the stabilisation of the Cable Protection System (CPS) installed on the infield cables exiting the monopiles of the Sandbank & Hornsrev 3 (HR3) Offshore Wind Farms.

Learn More

N-SEA SURVEY – VARIOUS PROJECTS (2021) GIS COORDINATOR

OI was requested to provide GIS coordination services

Learn More

Seaway 7 – Formosa 2 OWF (2020)

OI provided Seaway 7 with offshore engineering support during the pin pile installation phase.

Learn More

Jan de Nul - Cable repeair procedures (2019)

The development of cable repair procedures and repair concepts, supported by associated risk assessments, as part of Tennet’s emergency plan for the fastest possible restoration of unimpeded cable connections of their submarine cable system.

Learn More

SPT - Engineering Support for FPSO Mooring Project (2019)

SPT requested ARC to support them with the engineering work for the general structural design of the suction anchor pile.

Learn More

N-Sea - Subsea Clamp Installation (2019)

N-Sea approached ARC with a request to support them with drafting for several disciplines.

Learn More

Boskalis/VBMS - Hohe See Engineering Support (2018)

ARC-ses was contracted by Boskalis/VBMS to assist with creating installation procedures for the cable laying, cable pull-in and cable burial operations.

Learn More

VBMS - Borssele Bete Engineering and Installation Support

Boskalis has contracted ARC to perform the following Engineering and Installation support

Learn More

Tideway - Seamade - Works Manager + Lead Engineer

Tideway has contracted ARC to provide a Works Manager for the export cable installation and a Lead Engineer

Learn More

Boskalis - Engineering Support Inch Cape

ARC-ses assists with generating deliverables for the Early Engineering works and interface with employer's subcontractors to provide cable installation feedback on the design process.

Learn More

Tideway - Support Documentation Livingstone

ARC-ses assists with gaining overview of required documentation and status thereof.

Learn More

VBMS - Borselle (2017)

VBMS has contracted ARC to perform the following: Route Engineering, Survey, Positioning and as-built procedures, OoS Cable Removal Risk Assessment and Procedures, Pre Lay Grapnel Run (PLGR) Risk Assessment and Procedures, Platform Pull-in Procedures and Cable Lay Procedures.

Learn More

VBMS – Arkona Windfarm (2017)

VBMS has contracted ARC to perform the following Design and Engineering support for a T-Rex boulder clearance tool; Tool Mobilization, Launch, Normal operations, Recovery and Maintenance procedures and operational support assigning a Field Engineer for the boulder clearance execution phase.

Learn More
DCIM100MEDIADJI_0324.JPG

VBMS - Hohe See - Installation Support (2017)

VBMS has contracted ARC to perform the following Engineering and Installation support: Infield Cables Lay & Pull-in procedures, Infield Cables Pull-in procedures, Pre Lay Grapnel Run (PLGR) & Out of Service (OoS) cable removal procedures and Infield Cables Pull-in procedures.

Learn More

Tideway (2017)

Tideway has contracted ARC to perform the following Engineering and Installation support: Platform pull-in analyses and procedures, Cable lay analysis and procedures, Joint overboarding analyses, Cable Load-out analyses and additional support.

Learn More

Tideway (2017)

Tideway has contracted ARC to perform the following Engineering and Installation support: Monopile and OSS pull-in analysis and procedures, Cable burial sequence, Cable loading/transportation/loadout procedures, Cable Lay analysis and procedures, CIV mobilization plans and Drafting support.

Learn More

Tideway Installation Support for Rentel (2017)

Tideway has contracted ARC to perform the following Engineering and Installation support: Normal lay analyses, OSS and WTG pull-in analysis and procedures, Load-out analyses and drafting support.

Learn More

VBMS (2016)

VBMS has contracted ARC to perform the following Engineering and Installation support: Pull-in, cable lay, abandonment and recovery procedures.

Learn More

VBMS Dudgeon (2016)

VBMS has contracted ARC to perform the following procedures: Route Engineering, PLGR and Disposal, Vessel Loading & Transportation, Lay & Pull-in, Cable Recovery and Repair and Weather Assessment

Learn More

WPD (2015)

The Nordergründe wind park s situated in the mouth of the Weser and Jade estuary, which is a highly morphodynamic area. A survey performed in 2014 shows that the seabed level in the area of the wind farm varies between 2 and 11 meters below LAT. The design life of the wind farm is anticipated to be 25 years. ARC supported ....

Learn More

Gemini OWF (2015)

ARC was requested to write a Method Statement for Cable Burial with a MFE Tool (Mass Flow Excavator), with special attention to: Risk Assessment, Risk Assessment, ...

Learn More

Volker Wessels Boskalis (2013)

ARC supported Volker Wessels with Drafting package, cables installation analyses, and installation engineering of packages for Buitendieck, Westermost rough export cable and Nordsee Ost infield cables, ...

Learn More

Visser & Smit Marine Contractors (2013)

VSMC contracted ARC to make a conceptual design of the cable pull-in frame, which will be used for the infield cable pull-ins at the offshore substation. The designed frame comprises 3 sections connected by bolted flange connections. ...

Learn More

Visser & Smit Marine Contractors (2013)

ARC provided project engineering services, including method statements and procedures, as well as the review and guidance of VSMC assisting divisions. ...

Learn More

Offshore Windforce (2014)

Offshore Windforce VOF has been contracted by Dong Energy to transport and install 108 monopiles in the Irish Sea for West of Duddon Sands project. ARC supported OWF with drafting support for installation procedures of monopiles and transition pieces; Operations Management f free issued installation vessels, Sea Installer and Pacific Orca; ...

Learn More

Canyon (2013)

Canyon Offshore Ltd, a Helix Energy Solutions Company, has been invited to tender for the installation and trenching of the Borwin-1 HVAC cable, as part of Transpower’s Bard offshore wind farm, in Germany. ARC compile the HVAC cable installation method statements and ...

Learn More