Installation Engineering & Operational Support

VBMS - Borselle (2017)

VBMS has contracted ARC to perform the following: Route Engineering, Survey, Positioning and as-built procedures, OoS Cable Removal Risk Assessment and Procedures, Pre Lay Grapnel Run (PLGR) Risk Assessment and Procedures, Platform Pull-in Procedures and Cable Lay Procedures.

Learn More

VBMS – Arkona Windfarm (2017)

VBMS has contracted ARC to perform the following Design and Engineering support for a T-Rex boulder clearance tool; Tool Mobilization, Launch, Normal operations, Recovery and Maintenance procedures and operational support assigning a Field Engineer for the boulder clearance execution phase.

Learn More
DCIM100MEDIADJI_0324.JPG

VBMS - Hohe See - Installation Support (2017)

VBMS has contracted ARC to perform the following Engineering and Installation support: Infield Cables Lay & Pull-in procedures, Infield Cables Pull-in procedures, Pre Lay Grapnel Run (PLGR) & Out of Service (OoS) cable removal procedures and Infield Cables Pull-in procedures.

Learn More

Tideway (2017)

Tideway has contracted ARC to perform the following Engineering and Installation support: Platform pull-in analyses and procedures, Cable lay analysis and procedures, Joint overboarding analyses, Cable Load-out analyses and additional support.

Learn More

Tideway (2017)

Tideway has contracted ARC to perform the following Engineering and Installation support: Monopile and OSS pull-in analysis and procedures, Cable burial sequence, Cable loading/transportation/loadout procedures, Cable Lay analysis and procedures, CIV mobilization plans and Drafting support.

Learn More

Tideway Installation Support for Rentel (2017)

Tideway has contracted ARC to perform the following Engineering and Installation support: Normal lay analyses, OSS and WTG pull-in analysis and procedures, Load-out analyses and drafting support.

Learn More

VBMS (2016)

VBMS has contracted ARC to perform the following Engineering and Installation support: Pull-in, cable lay, abandonment and recovery procedures.

Learn More

VBMS Dudgeon (2016)

VBMS has contracted ARC to perform the following procedures: Route Engineering, PLGR and Disposal, Vessel Loading & Transportation, Lay & Pull-in, Cable Recovery and Repair and Weather Assessment

Learn More

WPD (2015)

The Nordergründe wind park s situated in the mouth of the Weser and Jade estuary, which is a highly morphodynamic area. A survey performed in 2014 shows that the seabed level in the area of the wind farm varies between 2 and 11 meters below LAT. The design life of the wind farm is anticipated to be 25 years. ARC supported ....

Learn More

Gemini OWF (2015)

ARC was requested to write a Method Statement for Cable Burial with a MFE Tool (Mass Flow Excavator), with special attention to: Risk Assessment, Risk Assessment, ...

Learn More

Volker Wessels Boskalis (2013)

ARC supported Volker Wessels with Drafting package, cables installation analyses, and installation engineering of packages for Buitendieck, Westermost rough export cable and Nordsee Ost infield cables, ...

Learn More

Visser & Smit Marine Contractors (2013)

VSMC contracted ARC to make a conceptual design of the cable pull-in frame, which will be used for the infield cable pull-ins at the offshore substation. The designed frame comprises 3 sections connected by bolted flange connections. ...

Learn More

Visser & Smit Marine Contractors (2013)

ARC provided project engineering services, including method statements and procedures, as well as the review and guidance of VSMC assisting divisions. ...

Learn More

Offshore Windforce (2014)

Offshore Windforce VOF has been contracted by Dong Energy to transport and install 108 monopiles in the Irish Sea for West of Duddon Sands project. ARC supported OWF with drafting support for installation procedures of monopiles and transition pieces; Operations Management f free issued installation vessels, Sea Installer and Pacific Orca; ...

Learn More

Canyon (2013)

Canyon Offshore Ltd, a Helix Energy Solutions Company, has been invited to tender for the installation and trenching of the Borwin-1 HVAC cable, as part of Transpower’s Bard offshore wind farm, in Germany. ARC compile the HVAC cable installation method statements and ...