Installation Engineering & Operational Support
Bluestream – Wells Decommissioning (2022) Project Engineering
Providing project engineering support on the procedures development, P&ID and deck layout drafting, and mob/demob plans; as well as offshore project engineering during operations.
Learn MoreDEME – Kaskasi (2022) Project Engineering
Providing project engineering assistance for 2 scopes at Kaskasi Wind Farm: monopile installation and TP installation.
Learn MoreBluestream – Various ROV & RA Projects (2022) Project Engineer
Assistance with the preparation of documents and datasheets for Rope Access & ROV projects in both Oil&Gas and wind industries. Most of them take place in the UK, German or Danish waters.
Learn MoreSeaway7 - Hollandse Kust Zuid (2022) Field Engineer for Monopile installation
Field engineer tasks including assist during loadout; check pile hole/gripper arm clashes; log rigging usage; prepare navigation lights; distribute as-built documentation; design solutions to improve operation.
Learn MoreJan de Nul – Greenlink/Formosa 2 (2022) Project Engineering
Project Engineering Various Projects, including average fuel consumption and preparing repair scope in Greater Changhua OWF. Lastly, vessel based work including MDR's; Client and MWS interface; Ensure QA/QC standards are met; MOCs development; Crew changes planning and logistics.
Learn More

Seaway 7 – Formosa 2 OWF (2022)
Project/Field Engineer(s) providing engineering support both offshore and on board Heavy Lift Vessel.
Learn More
DCN - 50hertz (2022) Project Engineer for Fiberoptic Cable Repair
The work consisted of project preparations such as work procedures; supporting drawings; project engineering for Fiberoptic Cable Repair.
Learn MoreDEME Offshore – Kaskasi OWF (2022) Inter Array Cable Installation Analysis
DEME Offshore contracted ARC to provide the following: - Freelay analysis - A&R analysis - Survival analysis - 1st end pull-in analysis - 2nd end pull-in analysis - Reporting
Learn More
DEME Offshore – Munmu Baran (2022)
The MunmuBaram Floating Wind Turbine Installation Analysis in OrcaFlex.
Learn More
N-Sea – (2022)
Lead Orcaflex Engineer providing assistance for the cable repair and installation analysis.
Learn More
Boskalis – Dolwin 6 & Ostwind 2 (2022) Project/Field Engineer o/b cable jointing vessel
Jointing the nearshore and offshore export cable sections of Dolwin 6 & Ostwind 2 OWFs.
Learn More
Seaway 7 – Hollandse Kust Zuid (2022) Project Representative
Project representative at SIF yard for the load out of monopiles / secondary structure.
Learn MoreDEME Offshore – St. Nazaire (2022) Project & Field Engineering Support
DEME has contracted ARC to provide project and field engineering support on the T&I secondary works. The following specific activities are to be overviewed and planned as part of the SOW at every installation location
Learn MoreBluestream – Petrogas HELM decommissioning (2021) Decommissioning Support
The ARC Engineers supported the various decommissioning projects, where required (e.g. Helm, Haven, Hoorn) by preparing documentation, reviewing engineering and vendor documentation, defining scopes of work, etc.
Learn MoreBoskalis – Kakinada (2021) Project Engineering Support
The scope of work envisaged for ARC-SES was as follows: - Development and writing the project’s Installation Manual - Mobilisation and Offshore Support
Learn MoreBoskalis Subsea Cables – Sandbank & Hornsrev 3 (HR3) Offshore Wind Farms – Engineering support (office & offshore) CPS stabilization via rock bag installation
Boskalis was awarded the stabilisation of the Cable Protection System (CPS) installed on the infield cables exiting the monopiles of the Sandbank & Hornsrev 3 (HR3) Offshore Wind Farms.
Learn MoreN-SEA SURVEY – VARIOUS PROJECTS (2021) GIS COORDINATOR
OI was requested to provide GIS coordination services
Learn MoreSeaway 7 – Formosa 2 OWF (2020)
OI provided Seaway 7 with offshore engineering support during the pin pile installation phase.
Learn MoreJan de Nul - Cable repeair procedures (2019)
The development of cable repair procedures and repair concepts, supported by associated risk assessments, as part of Tennet’s emergency plan for the fastest possible restoration of unimpeded cable connections of their submarine cable system.
Learn MoreSPT - Engineering Support for FPSO Mooring Project (2019)
SPT requested ARC to support them with the engineering work for the general structural design of the suction anchor pile.
Learn MoreN-Sea - Subsea Clamp Installation (2019)
N-Sea approached ARC with a request to support them with drafting for several disciplines.
Learn MoreBoskalis/VBMS - Hohe See Engineering Support (2018)
ARC-ses was contracted by Boskalis/VBMS to assist with creating installation procedures for the cable laying, cable pull-in and cable burial operations.
Learn MoreVBMS - Borssele Bete Engineering and Installation Support
Boskalis has contracted ARC to perform the following Engineering and Installation support
Learn MoreTideway - Seamade - Works Manager + Lead Engineer
Tideway has contracted ARC to provide a Works Manager for the export cable installation and a Lead Engineer
Learn MoreBoskalis - Engineering Support Inch Cape
ARC-ses assists with generating deliverables for the Early Engineering works and interface with employer's subcontractors to provide cable installation feedback on the design process.
Learn MoreTideway - Support Documentation Livingstone
ARC-ses assists with gaining overview of required documentation and status thereof.
Learn MoreVBMS - Borselle (2017)
VBMS has contracted ARC to perform the following: Route Engineering, Survey, Positioning and as-built procedures, OoS Cable Removal Risk Assessment and Procedures, Pre Lay Grapnel Run (PLGR) Risk Assessment and Procedures, Platform Pull-in Procedures and Cable Lay Procedures.
Learn MoreVBMS – Arkona Windfarm (2017)
VBMS has contracted ARC to perform the following Design and Engineering support for a T-Rex boulder clearance tool; Tool Mobilization, Launch, Normal operations, Recovery and Maintenance procedures and operational support assigning a Field Engineer for the boulder clearance execution phase.
Learn MoreVBMS - Hohe See - Installation Support (2017)
VBMS has contracted ARC to perform the following Engineering and Installation support: Infield Cables Lay & Pull-in procedures, Infield Cables Pull-in procedures, Pre Lay Grapnel Run (PLGR) & Out of Service (OoS) cable removal procedures and Infield Cables Pull-in procedures.
Learn MoreTideway (2017)
Tideway has contracted ARC to perform the following Engineering and Installation support: Platform pull-in analyses and procedures, Cable lay analysis and procedures, Joint overboarding analyses, Cable Load-out analyses and additional support.
Learn More
Tideway (2017)
Tideway has contracted ARC to perform the following Engineering and Installation support: Monopile and OSS pull-in analysis and procedures, Cable burial sequence, Cable loading/transportation/loadout procedures, Cable Lay analysis and procedures, CIV mobilization plans and Drafting support.
Learn MoreTideway Installation Support for Rentel (2017)
Tideway has contracted ARC to perform the following Engineering and Installation support: Normal lay analyses, OSS and WTG pull-in analysis and procedures, Load-out analyses and drafting support.
Learn MoreVBMS (2016)
VBMS has contracted ARC to perform the following Engineering and Installation support: Pull-in, cable lay, abandonment and recovery procedures.
Learn MoreVBMS Dudgeon (2016)
VBMS has contracted ARC to perform the following procedures: Route Engineering, PLGR and Disposal, Vessel Loading & Transportation, Lay & Pull-in, Cable Recovery and Repair and Weather Assessment
Learn MoreWPD (2015)
The Nordergründe wind park s situated in the mouth of the Weser and Jade estuary, which is a highly morphodynamic area. A survey performed in 2014 shows that the seabed level in the area of the wind farm varies between 2 and 11 meters below LAT. The design life of the wind farm is anticipated to be 25 years. ARC supported ....
Learn More
Gemini OWF (2015)
ARC was requested to write a Method Statement for Cable Burial with a MFE Tool (Mass Flow Excavator), with special attention to: Risk Assessment, Risk Assessment, ...
Learn MoreVolker Wessels Boskalis (2013)
ARC supported Volker Wessels with Drafting package, cables installation analyses, and installation engineering of packages for Buitendieck, Westermost rough export cable and Nordsee Ost infield cables, ...
Learn MoreVisser & Smit Marine Contractors (2013)
VSMC contracted ARC to make a conceptual design of the cable pull-in frame, which will be used for the infield cable pull-ins at the offshore substation. The designed frame comprises 3 sections connected by bolted flange connections. ...
Learn MoreVisser & Smit Marine Contractors (2013)
ARC provided project engineering services, including method statements and procedures, as well as the review and guidance of VSMC assisting divisions. ...
Learn MoreOffshore Windforce (2014)
Offshore Windforce VOF has been contracted by Dong Energy to transport and install 108 monopiles in the Irish Sea for West of Duddon Sands project. ARC supported OWF with drafting support for installation procedures of monopiles and transition pieces; Operations Management f free issued installation vessels, Sea Installer and Pacific Orca; ...
Learn MoreCanyon (2013)
Canyon Offshore Ltd, a Helix Energy Solutions Company, has been invited to tender for the installation and trenching of the Borwin-1 HVAC cable, as part of Transpower’s Bard offshore wind farm, in Germany. ARC compile the HVAC cable installation method statements and ...
Learn More