Cable Burial with MFE Tool

The Gemini windfarm is located in the Dutch part of the North Sea 85 km off the shoreline and will be operation al in 2017. The windfarm will have a capacity of 600 MW.

DUC has requested ARC to write a Method Statement for Cable Burial with a MFE Tool (Mass Flow Excavator), with special attention to:

•Risk Assessment
•Sequence of work (incl. survey)
•Mooring Plan
•Workability
•Storyboard