Cable Analysis and Installation Project - Hornsea
The Hornsea Offshore Wind Farm is a planned windfarm located in the North Sea off the coast of East Yorkshire. The project comprises of 3 Export Cable routes to a Reactive Compensation Station (RCS), 3 Export Cable routes from the RCS to the Offshore Substations (OSS’s) and 2 interlink routes connecting the OSS’s.
The total amount of Export Cable length is approx. 500km.
Tideway has contracted ARC to perform the following Engineering and Installation support:
•Platform pull-in analyses and procedures
•Cable lay analysis and procedures
•Joint overboarding analyses
•Cable Load-out analyses
•Additional support