Pull-in Analysis

Merkur Offshore Windfarm is a windfarm located in the North Sea, 45km north of the coast of the German island Borkum. The project involves the installation of 73 offshore power cables.

Tideway has contracted ARC to perform the following Engineering and Installation support:

•Monopile and OSS pull-in analysis and procedures
•Cable burial sequence
•Cable loading/transportation/loadout procedures
•Cable Lay analysis and procedures
•CIV mobilization plans
•Drafting support