The Borssele Alpha Export Cable project is located eastwards from the coast of Vlissingen, the Netherlands. The project scope consists of the design, manufacturing and installation of two 220kV subsea cables between the Borssele Alpha OWF offshore substation and the onshore substation in the town of Borssele.

ARC’s scope:

VBMS has contracted ARC to perform the following Engineering and Installation support:

• Route Engineering
• Survey, Positioning and as-built procedures
• OoS Cable Removal Risk Assessment and Procedures
• Pre Lay Grapnel Run (PLGR) Risk Assessment and Procedures
• Platform  Pull-in Procedures
• Cable Lay Procedures