Installation Support
Dudgeon Offshore Windfarm is a windfarm located in the North Sea, 40km off the coast of the seaside town of Cromer in North Norfolk. The project involves 67 6 MW WTG’s with a total capacity of 402 MW and the the installation of two 42 km long export cables and 67 inter-array cables with a total length of 100 km.
VBMS has contracted ARC to perform the following procedures:
•Route Engineering
•PLGR and Disposal
•Vessel Loading & Transportation
•Lay & Pull-in
•Cable Recovery and Repair
•Weather Assessment
