Installation Support
Galloper Wind Farm is a 336MW offshore wind farm project, currently being constructed 30km off the coast of Suffolk. The windfarm contains 56 6 MW WTG’s, 56 infield subsea cables and two 45km long subsea buried export cables. The project will be fully operational in 2018.
VBMS has contracted ARC to perform the following Engineering and Installation support:
•Pull-in Procedures
•Cable Lay Procedures
•Abandonment and recovery procedures