Installation Engineering
For the Westermost Rough Wind Farm offshore on the UK coast, near the Humber River, VSMC was in charge of the installation of the export cable from the transformer station to the transition joint bay on shore. The cable was to be pulled through a pre-drilled HDD-duct and buried at 2m depth in the seabed, with use of the Sea Stallion Plough. Installation work was performed by the Stemat Spirit.
ARC’s scope of work:
ARC provided project engineering services, including method statements and procedures, as well as the review and guidance of VSMC assisting divisions