N-Sea – (2022)

N-Sea – Analysis Scope

Project description:

N-Sea requested assistance for the cable repair and installation analysis

ARC’s scope of work:

  1. Free lay analysis
  2. Abandonment and recovery analysis
  3. 1st end inline joint over boarding analysis
  4. Jointing analysis
  5. Omega joint over boarding analysis
  6. 6‐point mooring spread, mooring analysis
  7. 8‐point jointing mooring spread and mooring analysis
  8. Single line failure analysis