Project description:
Tideway recently received their new Cable Installation Vessel (CIV) the Living Stone.
On board of this CIV a brand-new and high-tech Cable Installation Spread (CIS) was installed. The vessel was delayed several times and was almost ready to sail out, but some required documentation was missing and flagged by their QHSE department.
ARC’s scope of work:
- Assist with gaining overview of required documentation and status thereof.
- Preparation of CIS Emergency and Contingency Plan.