DEME Offshore – Kaskasi OWF (2022) Inter Array Cable Installation Analysis

Project description:

 

DEME offshore requested assistance for the cable lay installation analysis for the inter-array cables for the Kaskasi offshore wind farm. 

 

ARC’s scope of work:

DEME Offshore contracted ARC to provide the following:

Freelay analysis
A&R analysis
Survival analysis
1st end pull-in analysis
2nd end pull-in analysis

 

Reporting